Page 8 - Spring Garden Township - Spring-Summer 2021
P. 8

PUBLIC WORKS

        ROAD PROGRAM                                           Homeowners will receive written

        Road Program                                           documentation no later than 48
                                                               hours prior to the street in front of
        Spring Garden Township’s roadwork season is            the home receiving the application.
        generally from April to October. The Township is       Microsurfacing takes a couple of hours
        responsible for maintaining 58 lane miles.             to set; it should not be driven on for
                                                               about 4 hours.
        Segments of the following roads are in the 2021
        Road Program/2” paving overlay:  Old Garden Ln.        The Township will not be responsible for removing
        from Clover Ln. to Hillcroft; Waters Rd. from Queen    the asphalt from your vehicles.
        St. to Township Line; Hillcrest Rd. from Queen St. to
        Crescent Rd.; Edgehill Rd. from Queen St. to           Segments of the following roads are in the 2021
        Crescent Rd.; and, Regents Glen Blvd. from Country     Road Program/Microsurfacing: Valley View Rd. from
        Club Rd. to the cul-de-sac.                            Woodberry Rd. to Southern Rd.; Glendale Rd. from
                                                               Midland Ave. to Crestlyn Rd.; Crestlyn Rd. from Niles
                  Some roads with a low to moderate level      Rd. to Woodberry Rd.; Niles Rd. from Rathton Rd. to
                  of degradation are selected to receive a     Woodberry Rd.; Chesley Rd. from Hillcrest Rd. to
                   microsurfacing surface treatment.           Greendale Rd.; Small Brook Ln. from Woodland Rd.
                     Microsurfacing is applied to help preserve  to Country Club Rd.; and, Upland Rd. from Wyndham
                      and protect the pavement structure and   Dr. to Glenwood Dr.
                      furnish a new driving surface.





          SEWER

          Public Sewer System
          The sanitary sewer user rates increased mid-2020.
          This was due to the degree of repairs necessary to
          be scheduled for maintenance on the system such
          as replacement of sewer mains, repair of leaking
          laterals, and replacement of deteriorating
          manholes. The Township regularly televises the
          sewer mains looking for cracks, sags in the pipe,
          and infl ow and infi ltration.  Unfortunately, sewer
          rates will not remain stagnant; the age of the
          conveyance system and the sale of the York City       The mitigation of I&I is vital to caring for the
          Sewer Treatment Plant will result in increases over   environment and capital investment in the sewer
          the next several years. We will do our part by        system and treatment facilities.  The more I&I that
          analyzing the cost of projects and budget             is controlled, the better the management of costs.
          conservatively for unexpected repairs before          The Township pays both York City and
          proposing rate increases.  Any increases to services   Springettsbury Township by the gallon for sewage
          are addressed at the Board of Commissioners           treatment.  You can help by disconnecting the
          meetings which are publicly held and advertised.      following that tie into the sanitary sewer system:

          What is infl ow and infi ltration (I&I) into a sanitary   sump pumps, fl oor drains, and roof leaders.  We will
          sewer system?  Infi ltration enters a sewer system    do our part by investigating the system for leaks
          through malfunctioning pipe joints, breaks, cracks,   and faults as well as repairing located defects.
          or manhole faults.  Infl ow generally occurs when     Want to learn more about the York City Sewer
          rainfall enters the system through connections such   Treatment Plant Sale and ways to keep your rates
          as roof leaders, yard drains, sump pumps, and         low and to protect yourself and your neighbors?
          faulty manhole covers and frame seals.                Visit: https://yorkregionalsewer.com/





         page 8  |  Spring Garden Township                                                    Phone: 717.848.2858
   3   4   5   6   7   8   9   10   11   12