Page 8 - Spring Garden Township - Spring-Summer 2021
P. 8
PUBLIC WORKS
ROAD PROGRAM Homeowners will receive written
Road Program documentation no later than 48
hours prior to the street in front of
Spring Garden Township’s roadwork season is the home receiving the application.
generally from April to October. The Township is Microsurfacing takes a couple of hours
responsible for maintaining 58 lane miles. to set; it should not be driven on for
about 4 hours.
Segments of the following roads are in the 2021
Road Program/2” paving overlay: Old Garden Ln. The Township will not be responsible for removing
from Clover Ln. to Hillcroft; Waters Rd. from Queen the asphalt from your vehicles.
St. to Township Line; Hillcrest Rd. from Queen St. to
Crescent Rd.; Edgehill Rd. from Queen St. to Segments of the following roads are in the 2021
Crescent Rd.; and, Regents Glen Blvd. from Country Road Program/Microsurfacing: Valley View Rd. from
Club Rd. to the cul-de-sac. Woodberry Rd. to Southern Rd.; Glendale Rd. from
Midland Ave. to Crestlyn Rd.; Crestlyn Rd. from Niles
Some roads with a low to moderate level Rd. to Woodberry Rd.; Niles Rd. from Rathton Rd. to
of degradation are selected to receive a Woodberry Rd.; Chesley Rd. from Hillcrest Rd. to
microsurfacing surface treatment. Greendale Rd.; Small Brook Ln. from Woodland Rd.
Microsurfacing is applied to help preserve to Country Club Rd.; and, Upland Rd. from Wyndham
and protect the pavement structure and Dr. to Glenwood Dr.
furnish a new driving surface.
SEWER
Public Sewer System
The sanitary sewer user rates increased mid-2020.
This was due to the degree of repairs necessary to
be scheduled for maintenance on the system such
as replacement of sewer mains, repair of leaking
laterals, and replacement of deteriorating
manholes. The Township regularly televises the
sewer mains looking for cracks, sags in the pipe,
and infl ow and infi ltration. Unfortunately, sewer
rates will not remain stagnant; the age of the
conveyance system and the sale of the York City The mitigation of I&I is vital to caring for the
Sewer Treatment Plant will result in increases over environment and capital investment in the sewer
the next several years. We will do our part by system and treatment facilities. The more I&I that
analyzing the cost of projects and budget is controlled, the better the management of costs.
conservatively for unexpected repairs before The Township pays both York City and
proposing rate increases. Any increases to services Springettsbury Township by the gallon for sewage
are addressed at the Board of Commissioners treatment. You can help by disconnecting the
meetings which are publicly held and advertised. following that tie into the sanitary sewer system:
What is infl ow and infi ltration (I&I) into a sanitary sump pumps, fl oor drains, and roof leaders. We will
sewer system? Infi ltration enters a sewer system do our part by investigating the system for leaks
through malfunctioning pipe joints, breaks, cracks, and faults as well as repairing located defects.
or manhole faults. Infl ow generally occurs when Want to learn more about the York City Sewer
rainfall enters the system through connections such Treatment Plant Sale and ways to keep your rates
as roof leaders, yard drains, sump pumps, and low and to protect yourself and your neighbors?
faulty manhole covers and frame seals. Visit: https://yorkregionalsewer.com/
page 8 | Spring Garden Township Phone: 717.848.2858